Textile Calculators Logo TEXTILE CALCULATOR
Directory

Spinning calculator

Ring Frame Production

Calculate Ring Frame production output per spindle in kg per hour

Production per Spindle (kg)
--
Production per Spindle (kg/8 Hrs)
--
Directory

Method and formula

Production per spindle (kg/Hrs)=Spindle Speed×60×EfficiencyTPI×36×840×Ne×2.20462\begin{aligned} \text{Production per spindle (kg/Hrs)} &= \frac{\text{Spindle Speed} \times 60 \times \text{Efficiency}}{\text{TPI} \times 36 \times 840 \times \text{Ne} \times 2.20462} \end{aligned}

Input variables

VariableExpected entry
Spindle speed (RPM)Enter a positive measured value.
Efficiency (%)Enter a positive measured value.
TwistEnter a positive measured value.
Twist UnitChoose: TPI, TPM
Yarn Linear DensityEnter a positive measured value.
Linear Density UnitChoose: Ne, Nm, Tex, Denier, Dtex

Calculation workflow

  1. Enter the measurements in the displayed units.
  2. Check the selected yarn, fiber, weave, or trade unit where shown.
  3. Review each calculated output and its unit.
  4. Use Copy results to save the displayed values to recent history.

Outputs

  • Production per Spindle (kg)
  • Production per Spindle (kg/8 Hrs)